Customization: | Available |
---|---|
Type: | Tank Reactor |
Material: | Stainless Steel or Carbon Steel |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Capacity(L) | Tube diameter | Jacket diameter Ømm | Motor Power KW | Reducer models | Stirring speed r.p.m |
30 | 400 | 500 | 0.6-1.1 | M2 | 60-80 |
50 | 500 | 600 | 0.6-1.1 | M3 | 60-80 |
100 | 550 | 650 | 1.1-1.5 | M4 | 60-80 |
150 | 600 | 700 | 2.2 | M6 | 60-80 |
200 | 650 | 750 | 2.2 | M6 | 60-80 |
300 | 800 | 900 | 2.2 | M6 | 60-80 |
500 | 900 | 1000 | 2.2 | M6 | 60-80 |
800 | 1100 | 1200 | 4 | M8 | 60-80 |
1000 | 1200 | 1300 | 4 | M8 | 60-80 |
1500 | 1300 | 1400 | 4 | M8 | 60-80 |
2000 | 1400 | 1500 | 4 | M8 | 60-80 |
2500 | 1400 | 1500 | 7.5 | BLB7.5-4-13 | 90 |
3000 | 1400 | 1500 | 7.5 | BLB7.5-4-13 | 90 |
3500 | 1400 | 1500 | 7.5 | BLB7.5-4-13 | 90 |
4000 | 1500 | 1600 | 7.5 | BLB7.5-4-23 | 63 |
5000 | 1600 | 1700 | 7.5 | BLB7.5-4-23 | 63 |
6000 | 1800 | 1900 | 15 | BLB15-5-13 | 100 |
8000 | 2000 | 2100 | 15 | BLB15-5-13 | 100 |
20000 | 3000 | 3200 | 37 | BLB450-11-45 | 50-100 |
Capacity | 50-20000L |
Design Pressure (Mpa) | Atmospheric or positive/negtive pressure |
Material | Carbon steel, stainless steel, enamel |
Heating Forms | Electrical heating with medium in jacket, external half coil steam heating, external half coil thermal oil heating, hot water electric heating etc. |
Stirring Power | Model selection is made according to material viscosity, liquid-solid ratio, liquid specific gravity, solid specific gravity, solid granularity, rotating speed, paddle type, with or without baffle or internal coil. |
Stirring blade Forms | Anchor type, frame type, paddle type, ribbon type, turbo type, turbine type, propelled and combination of different agitation forms |
Seal | Mechanical seal, magnetic seal or packing seal |
Inner Surface Treatment | Polished or no polished |
1) Plywood case packing if necessery.
2) Packed by plastic bags if for very big machines.
3) Trade term: FOB or CIF.
4) Sea shipping.
4. FAQ
About Delivery time
A-----Usually we send tne shipments in FOB term.However, the terms of CIF are acceptable which depend on the preference of clients.
About Lead Time
A------Usually it takes about 30-40 days after we receive your down payment and drawing confirmation.
About Payment Term
A------By T/T in Advance, or Irrevocable L/C as Sight.
Our machines can be customized, leave an inquiry to know more details about price, packing and shipping.